Check drawings before cutting
Fabrication quality begins before welding. The workshop should confirm drawing revision, material grade, plate thickness, hole positions, connection details, and member marks. Clear pre-production review helps avoid repeated cutting or incorrect structural steel members.
Control welding and dimensions
Steel beams, columns, trusses, and brackets should be inspected for weld appearance, alignment, straightness, hole accuracy, and connection plate position. For export projects, member identification should match the packing list and installation sequence.
Coating and anti-corrosion preparation
Surface treatment depends on project environment. Industrial steel buildings may require primer, finish paint, or other anti-corrosion treatment. Buyers should confirm coating color, dry film thickness expectations, and protection needs before delivery.
Export packing matters
Structural steel fabrication for overseas projects must consider transport. Bundling, member marks, bolt packing, and loading order can reduce site sorting time and make steel structure installation easier for the project team.